{"id":167,"date":"2022-08-05T04:14:27","date_gmt":"2022-08-05T04:14:27","guid":{"rendered":"http:\/\/103.245.90.234\/iwrm\/?page_id=167"},"modified":"2025-05-29T03:37:25","modified_gmt":"2025-05-29T03:37:25","slug":"country-iwrm-report-structure","status":"publish","type":"page","link":"http:\/\/aseaniwrm.water.gov.my\/iwrm\/country-iwrm-report-structure\/","title":{"rendered":"Country IWRM Report Structure"},"content":{"rendered":"\n<p><strong><u>COUNTRY IWRM PERFORMANCE REPORTS<\/u><\/strong><\/p>\n<p><strong><u>Template IWRM Performance Indicators<\/u><\/strong><\/p>\n<p style=\"\" text-align:=\"\" justify;\"\"=\"\">The IWRM Performance Indicators for each of the six water management issues were developed using the following:<\/p>\n<table>\n\t<tr valign=\"top\">\n\t\t<td>\u2022\t<\/td>\n\t\t<td><a href=\"https:\/\/aseaniwrm.water.gov.my\/iwrm\/iwrm-water-supply-management\/\">Water Supply<\/a><\/td>\n\t<\/tr>\n\t<tr valign=\"top\">\n\t\t<td>\u2022\t<\/td>\n\t\t<td><a href=\"https:\/\/aseaniwrm.water.gov.my\/iwrm\/iwrm-irrigation-management\/\">Irrigation<\/a><\/td>\n\t<\/tr>\n\t<tr valign=\"top\">\n\t\t<td>\u2022\t<\/td>\n\t\t<td><a href=\"https:\/\/aseaniwrm.water.gov.my\/iwrm\/iwrm-stormwater-management\/\">Stormwater Management<\/a><\/td>\n\t<\/tr>\n\t<tr valign=\"top\">\n\t\t<td>\u2022\t<\/td>\n\t\t<td><a href=\"https:\/\/aseaniwrm.water.gov.my\/iwrm\/iwrm-flood-management\/\">Flood Management<\/a><\/td>\n\t<\/tr>\n\t<tr valign=\"top\">\n\t\t<td>\u2022\t<\/td>\n\t\t<td><a href=\"https:\/\/aseaniwrm.water.gov.my\/iwrm\/iwrm-water-pollution-management\/\">Water Pollution Management<\/a><\/td>\n\t<\/tr>\n\t<tr valign=\"top\">\n\t\t<td>\u2022\t<\/td>\n\t\t<td><a href=\"https:\/\/aseaniwrm.water.gov.my\/iwrm\/iwrm-sanitation-management\/\">Sanitation Management<\/a><\/td>\n\t<\/tr>\n<\/table>\n<p><strong>Template IWRM Performance Indicators<\/strong> as shown in the Table below.<\/p>\n<p style=\"\" text-align:=\"\" justify;\"\"=\"\">The indicators are organized into four categories: one Outcome Indicator and three Management Indicators:-<\/p>\n<table>\n\t<tr valign=\"top\">\n\t\t<td>i. <\/td>\n\t\t<td>Enabling Environment (EE)<\/td>\n\t<\/tr>\n\t<tr valign=\"top\">\n\t\t<td>ii. <\/td>\n\t\t<td>Institutional Setup (IS)<\/td>\n\t<\/tr>\n\t<tr valign=\"top\">\n\t\t<td>iii. <\/td>\n\t\t<td>Management Tools (MT)<\/td>\n\t<\/tr>\n<\/table>\n<p style=\"\" text-align:=\"\" justify;\"\"=\"\">The Outcome Indicators represent values that reflect the State of Performance for a given IWRM issue. In contrast, the Management Indicators measure progress based on the attainment of specific desired Outputs across eight stages.<\/p>\n<p style=\"\" text-align:=\"\" justify;\"\"=\"\">For the Management Indicators, the presence of a desired Output is reported as Stage 8, indicating full achievement. The absence of the Output is reported within Stages 1 to 7, which reflect varying levels of progress toward that Output within each management category.<\/p>\n<p style=\"\" text-align:=\"\" justify;\"\"=\"\">The following are the eight-stage Process Indicators used to report progress in achieving a specific desired Output. Stage 8 signifies full achievement, at which point the focus of reporting shifts to the monitoring and evaluation of the Output\u2019s effectiveness in supporting the desired outcome. &#8220;NA&#8221; is used to indicate that a particular indicator is not applicable to the country.<\/p>\n\n\n<p><strong>Process Indicators for desired Outputs<\/strong><\/p>\n<p>Stage 1 Output not recognized as a need<\/p>\n<p>Stage 2 Output recognized as a need<\/p>\n<p>Stage 3 Output requirements clarified and defined<\/p>\n<p>Stage 4 Existence of a Plan to produce the Output<\/p>\n<p>Stage 5 Stakeholders consultation on Output in progress<\/p>\n<p>Stage 6 Stakeholders agreement on Output secured<\/p>\n<p>Stage 7 Plan implementation in progress<\/p>\n<p>Stage 8 Effectiveness of Output is monitored and evaluated<\/p>\n<p>NA Not Applicable<\/p>\n<p><strong>Template IWRM Performance Indicators<\/strong><\/p>\n<table width=\"604\">\n<tbody>\n<tr>\n<td colspan=\"2\" width=\"604\"><strong>Specific Water Management Issue<\/strong><\/td>\n<\/tr>\n<tr>\n<td width=\"160\"><strong>Indicator Type<\/strong><\/td>\n<td width=\"444\"><strong>Indicators<\/strong><\/td>\n<\/tr>\n<tr>\n<td width=\"160\">Outcome Indicators<\/td>\n<td width=\"444\"><u>List of desired outcomes to be measured (quantifiable)<\/u>\n<p><strong>Brief Description<\/strong>&#8211; Give a brief description on the progress in achieving the desired outcomes.<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td width=\"160\">Enabling Environment (EE) Indicators<\/td>\n<td width=\"444\"><u>List of desired EE outputs to be monitored (8 Stages) <\/u>\n<p><strong>YES<\/strong> &#8211; Desired Output (Stage 8-Monitoring &amp; Evaluation)<\/p>\n<p><strong>No<\/strong> &#8211; Desired Output (Stage 1-7 Status of Progress) Use 7-Stage Process Indicators to report on the current status of progress on development of the desired EE output.<\/p>\n<p><strong>Brief Description<\/strong> &#8211; Give a brief description on the progress in achieving (Stage 1-7) or monitoring &amp; evaluation of effectiveness (Stage 8) of the desired EE outputs.<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td width=\"160\">Institutional Set-up (IS) Indicators<\/td>\n<td width=\"444\"><u>List of desired IS outputs to be monitored (8 Stages) <\/u>\n<p><strong>YES<\/strong> &#8211; Desired Output (Stage 8-Monitoring &amp; Evaluation)<\/p>\n<p><strong>No<\/strong> Desired Output (Stage 1-7 Status of Progress) Use 7-Stage Process Indicators to report on the current status of progress on development of the desired EE output.<\/p>\n<p><strong>Brief Description<\/strong> &#8211; Give a brief description on the progress in achieving (Stage 1-7) or monitoring &amp; evaluation of effectiveness (Stage 8) of the desired IS outputs.<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td width=\"160\">Management Tools (MT) Indicators<\/td>\n<td width=\"444\"><u>List of desired MT outputs to be monitored (8 Stages) <\/u>\n<p><strong>YES<\/strong> &#8211; Desired Output (Stage 8-Monitoring &amp; Evaluation)<\/p>\n<p><strong>No<\/strong> Desired Output (Stage 1-7 Status of Progress) Use 7-Stage Process Indicators to report on the current status of progress on development of the desired EE output.<\/p>\n<p><strong>Brief Description<\/strong> &#8211; Give a brief description on the progress in achieving (Stage 1-7) or monitoring &amp; evaluation of effectiveness (Stage 8) of the desired MT outputs.<\/p>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>","protected":false},"excerpt":{"rendered":"<p>COUNTRY IWRM PERFORMANCE REPORTS Template IWRM Performance Indicators The IWRM Performance Indicators for each of the six water management issues were developed using the following: \u2022 Water Supply \u2022 Irrigation \u2022 Stormwater Management \u2022 Flood Management \u2022 Water Pollution Management \u2022 Sanitation Management Template IWRM Performance Indicators as shown in the Table below. The indicators &hellip; <\/p>\n<p class=\"link-more\"><a href=\"http:\/\/aseaniwrm.water.gov.my\/iwrm\/country-iwrm-report-structure\/\" class=\"more-link\">Read more<span class=\"screen-reader-text\"> &#8220;Country IWRM Report Structure&#8221;<\/span><\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"footnotes":""},"class_list":["post-167","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"http:\/\/aseaniwrm.water.gov.my\/iwrm\/wp-json\/wp\/v2\/pages\/167","targetHints":{"allow":["GET"]}}],"collection":[{"href":"http:\/\/aseaniwrm.water.gov.my\/iwrm\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"http:\/\/aseaniwrm.water.gov.my\/iwrm\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"http:\/\/aseaniwrm.water.gov.my\/iwrm\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"http:\/\/aseaniwrm.water.gov.my\/iwrm\/wp-json\/wp\/v2\/comments?post=167"}],"version-history":[{"count":45,"href":"http:\/\/aseaniwrm.water.gov.my\/iwrm\/wp-json\/wp\/v2\/pages\/167\/revisions"}],"predecessor-version":[{"id":636,"href":"http:\/\/aseaniwrm.water.gov.my\/iwrm\/wp-json\/wp\/v2\/pages\/167\/revisions\/636"}],"wp:attachment":[{"href":"http:\/\/aseaniwrm.water.gov.my\/iwrm\/wp-json\/wp\/v2\/media?parent=167"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}